09 / Design-Build

Design-build
delivery.

Design-Build Delivery

One team. One contract.

Architecture, engineering and construction under a single contract: streamlined communication, shorter timelines and better cost control.

Design-build puts designers and builders on the same team from day one. Constructability and cost are checked while the drawings are still being made, not discovered on site. For the owner it means one contract, one point of responsibility and a faster path from concept to completion.

Scope of work

What this service includes.

Single-source responsibility

One agreement covering design, engineering and construction.

Integrated design & costing

Budgets validated at every design stage, before the drawings are final.

Faster delivery

Overlapping design and construction phases compress the overall schedule.

Permit management

Applications and municipal coordination handled inside the same team.

Concept-to-completion delivery

From feasibility and layout to occupancy, without handoffs between firms.

Selected work

Projects we have delivered.

View the full gallery

Common questions

Frequently asked questions.

Why choose design-build over separate contracts?

Fewer surprises. The builder prices the design as it evolves, so the project that gets drawn is a project you can afford, and responsibility never falls between two firms.

Do we lose control over the design?

No. You approve the design at every stage. What changes is that each option comes with a real cost and schedule attached, so decisions are informed.

Is design-build faster?

Usually. Because design and construction overlap, long-lead items are ordered and early site work starts while detailed design is still finishing.

Your project. Our expertise.

Request a Quote